搜索资源列表
Project-Report-(Final)
- This project is the replacement of manual to automatic technology i.e. if the K.E.S.C goes off then load shift from K.E.S.C to Generator through ATS (Automatic Transfer Switch), similarly if K.E.S.C comes back then load again transfer from power