CDN加速镜像 | 设为首页 | 加入收藏夹
当前位置: 首页 资源下载 源码下载 通讯/手机编程 GPS编程 搜索资源 - k best

搜索资源列表

  1. femprb

    0下载:
  2. Optimal scheduling problem, assuming that n has a mission by the k-parallel machine to complete the work. I need to complete the mission time for ti. Try to design an algorithm to find n complete this task the best scheduling, making the time to comp
  3. 所属分类:GPS develop

    • 发布日期:2017-04-30
    • 文件大小:170.18kb
    • 提供者:mojtaba
搜珍网 www.dssz.com