搜索资源列表
20081022085235109
- 三菱公司PLC编程程序小结,有电梯控制,焚烧炉的控制程序-Summary Mitsubishi PLC programming procedures have elevator control, burning furnace control procedures
Integrated-stepper-motor-design
- 由步进电机实验,设计一个控制步进电机实验电路,能够完成步进电机调速控制,同时检测8种不同开关状态,实现7层楼的电梯运行过程控制。-By a stepping motor experiment, experimental design a stepper motor control circuit, to complete the stepper motor speed control, and 8 different switch status detection, to achieve 7 f
Elevator
- 基于51单片机的模拟电梯控制及显示程序,通过AD采样反馈楼层数,通过键盘的16个按键模拟每层楼的呼叫信息,和目的楼层的命令信息,通过动态数码管显示楼层。-Tool Elevator control and display program based on MCU AT89C52
Programs-of-PLC
- 三菱PLC控制应用范例之八层电梯的源码.-Mitsubishi PLC control the source code of the application example of the eight-story elevator.
LPC2138-LED
- LPC2138实现LED点阵控制,模拟电梯切换楼层 基于proteus仿真-LPC2138 achieve LED dot matrix control, analog switches floor elevator proteus simulation-based
left
- 是用步进电机控制自制电梯上下的源代码,希望你能采纳-Stepper motor control with homemade elevator up and down the source code, I hope you can adopt