搜索资源列表
-
0下载:
Source of Shifting bottleneck for Project scheduling
-
-
0下载:
1.《软件测试计划》(STP)描述对计算机软件配置项CSCI,系统或子系统进行合格性测试的计划安排。内容包括进行测试的环境、测试工作的标识及测试工作的时间安排等。
2.通常每个项目只有一个STP,使得需方能够对合格性测试计划的充分性作出评估
-1. " Software Test Plan" (STP) describes the computer software configuration item CSCI, system or subsystem qualifi
-
-
0下载:
Research on multi-mode resource constrained project scheduling based on particle swarm optimization algorithm.rar
-
-
0下载:
this a graduation project presentation about advanced frequency reuse schemes and scheduling in LTE system, delivered by telecom engineering students at An-Najah National University.-this a graduation project presentation about advanced frequency reu
-
-
1下载:
关于资源受限项目调度的遗传算法文章,使用NSGA2算法。-The article about the resource-constrained project scheduling genetic algorithm, using NSGA2 algorithm.
-
-
1下载:
使用NSGA2的多目标多模式资源受限项目调度问题的研究-NSGA2 multi-objective multi-mode resource-constrained project scheduling problem
-
-
0下载:
An Adapted Firefly Algorithm for Product Development Project
Scheduling with Fuzzy Activity Duration
-
-
0下载:
MS project desing and magement
-
-
0下载:
Economic Dispatch and Hydro Scheduling using Linear Programming
-
-
0下载:
This paper is about designing a weather station that automatically connected
to the center through a computer network. Beside it gives a deep control of
reading scheduling. The weather station is designed to measure temperature
and humidity.
-
-
1下载:
本程序用两种算法对五个进程进行调度,每个进程可有三个状态,并假设初始状态为就绪状态。初始优先数60。为了便于处理,程序中的运行时间以时间片为单位计算,各进程的优先数或轮转时间数以及进程需要运行的时间片数的初值均由用户给定。3) 在优先数算法中,进程每执行一次,优先数减3,CPU时间片数加1,进程还需要的时间片数减1,在轮转算法中,采用固定时间片,时间片数为2,进程每执行1次,CPU时间片数加2,进程还需要的时间数减2,并排列到就绪队列的尾上。-This procedure using two a
-