搜索资源列表
-
0下载:
1.《软件测试计划》(STP)描述对计算机软件配置项CSCI,系统或子系统进行合格性测试的计划安排。内容包括进行测试的环境、测试工作的标识及测试工作的时间安排等。
2.通常每个项目只有一个STP,使得需方能够对合格性测试计划的充分性作出评估
-1. " Software Test Plan" (STP) describes the computer software configuration item CSCI, system or subsystem qualifi
-
-
1下载:
关于资源受限项目调度的遗传算法文章,使用NSGA2算法。-The article about the resource-constrained project scheduling genetic algorithm, using NSGA2 algorithm.
-
-
1下载:
使用NSGA2的多目标多模式资源受限项目调度问题的研究-NSGA2 multi-objective multi-mode resource-constrained project scheduling problem
-
-
0下载:
An Adapted Firefly Algorithm for Product Development Project
Scheduling with Fuzzy Activity Duration
-
-
0下载:
Economic Dispatch and Hydro Scheduling using Linear Programming
-
-
0下载:
This paper is about designing a weather station that automatically connected
to the center through a computer network. Beside it gives a deep control of
reading scheduling. The weather station is designed to measure temperature
and humidity.
-