资源列表
tset
- 电子音乐生成,包含谐波与取包络的过程,模拟钢琴小提琴萨克斯的音色(Electronic music generation)
PTC
- 是一个有限控制集预测控制FCS-MPC应用于感应电机的模型,仿真结果很好,互相交流(It is a model of finite control set predictive control FCS-MPC applied to induction motor. The simulation results are very good and communicate with each other.)
张正友摄像机标定程序
- 相机标定,基于张正友标定法,用相机对准二维靶标,提取角点(wu eth trhhs gerg ehtrts theshb htesh)
PiChuLirecovery_LAStime
- 用于批量恢复GXZNZ格式的点云时间信息。GXZNZ为自定义的和LAS最接近的文本格式。(It is used for batch recovery of point cloud time information in GXZNZ Format of GXZNZ is customed and is a LAS's closest text format.)
untitled
- load flow optimization technique
k-means算法
- Kmeans算法是一个重复移动类中心点的过程,把类的中心点,也称重心(centroids),移动到其包含成员的平均位置,然后重新划分其内部成员。(The Kmeans algorithm is a process of repeating the center point of a moving class, moving the center of the class, also known as centroids, to the average position of its member
route
- 无线传感器网络的matlab仿真程序,主要是仿真无线传感器的路由协议(Matlab simulation program for Wireless Sensor Networks.Routing protocol of simulation wireless sensor)
lizilvbo
- 粒子滤波的MATLAB实现,通过寻找一组在状态空间中传播的随机样本来近似的表示概率密度函数,用样本均值代替积分运算,进而获得系统状态的最小方差估计的过程,这些样本被形象的称为“粒子”,故而叫粒子滤波(MATLAB implementation of particle filter,By looking for a set of random samples which are propagated in the state space to approximate the probability
U_E_threedimen
- 采用模拟电荷法,以点电荷为模拟电荷,在三维空间中计算一个档距的输电线路周围电场。(Using the charge simulation method to calculate the electric field around transmission line of one span in the 3D space, the point electric charge is used as the simulation charge.)
check
- 模拟电荷法校验程序。针对架空输电线路,将位于导线中心的模拟电荷计算出来后,选取导线表面的校验点,对计算结果误差进行检验。(Analog charge method check program. For the overhead transmission line, the simulated charge located at the conductor center is calculated, and the checkpoint of the conductor surface is se
hfssapi
- 可以改变源代码的参数来实现matlab控制hfss,来进行复杂的建模。(You can change the source code parameters to achieve matlab control hfss, for complex modeling.)
VRP
- VRP,遗传算法的路径优化问题,车辆调度问题的MATLAB实现(VRP,Path optimization problem of genetic algorithm,MATLAB implementation of vehicle scheduling problem.)