资源列表
iec104
- IEC-104电力规约测试开发工具,可用作测试,或代码移植。-IEC104 power specification test development tools, can be used for testing, or code portability.
yuce
- 该程序为:持续法、基于最小二乘的线性回归、时间序列以及灰色理论等预测方法对风电功率进行超短期预测-Ultra- short- term prediction of wind power
RTKLIB-rtklib_2.4.3
- RTKLIB is an open source program package for standard and precise positioning with GNSS (global navigation satellite system). RTKLIB consists of a portable program library and several APs (application programs) utilizing the library. -RTKLIB is an op
simulink-of-wind-speed
- 模拟风速模型,包含渐变风、阵风、随即风。大小可以自己设置-Wind speed simulation model, contains gradient wind gusts, the wind immediately. You can set your own size
shigongtu_benggongtu
- 程序为地面示功图转泵功图的程序,其中包含两个程序,一个是一级杆地面示功图转泵功图,另一个是三级杆地面示功图转泵功图。-The program is a program of ground power transfer diagram, which contains two programs, one is a ground pole dynamometer, and the other is a three-pole ground power transfer pump diagram.
Main_Read_-micro_logging_data
- 从地震数据辅助文件SPS的C注释文件中读取微测井数据并显示时深关系曲线,微测井数据可用来建立表层地质模型。-The micro-log data are read the C-file of the seismic data supporting file SPS and the time-depth relation curve is displayed. The micro-logging data can be used to build the surface geological m
pengmominglingliu
- ANSYS APDL命令流,模拟旋转机械碰摩问题。-It is a program of ANSYS APDL to simulate the rubbing problems of rotating machinery.
shichaxiaozheng
- 用互相关法求相对剩余静校正量;并用时差统计法或相关函数统计法分离,最后可求出记录道的绝对剩余静校正量。-Using cross correlation method the relative residual statics and separated by the difference method or statistical correlation function statistics of the last track can be obtained an absolute resi
NiC_PFC
- 基于氮化镓的双BOOST电路,大功率UPS前置PFC电路-BOOST AND PFC
VB_modbus-tcp_access
- VB做的生产线管理系统,跟mcgs触摸屏通过modbus TCP协议通信,数据库用access做的,已调试。-VB do the production line management system, with mcgs touch screen through modbus TCP protocol communication, access to do, has been debugging.
Three_pase_PLL
- 三相锁相环 PLL 基于s-function builder模块编写 经测试可用 整流逆变均可用-three-phase PLL based on s-function builder
Desktop
- 电力系统暂态和静态稳定性分析,SIMULINK仿真。最大切除时间,系统不至失稳-And static power system transient stability analysis, SIMULINK simulation. The maximum clearing time, the system does not destabilization