文件名称:JIExianfenxi
-
所属分类:
- 标签属性:
- 上传时间:2012-11-16
-
文件大小:8.01kb
-
已下载:0次
-
提 供 者:
-
相关连接:无下载说明:别用迅雷下载,失败请重下,重下不扣分!
介绍说明--下载内容来自于网络,使用问题请自行百度
电能计量装置正确接线是保证计量准确的前提,因为电能表、电压互感器(PT)、电流互感器(CT)的误差很小,而错接线造成的误差却可达到无穷大(错接线时的停走现象),真可谓一线之差,电量千万,所以在投运前或运行中应定期进行接线检查。接线检查可分两种情况:停电检查、带电检查。停电检查必较简单,它一般是对于新装或更换PT、CT以及其它计量装置投运前进行检查,主要内容是检查PT、CT的极性、变比及二次接线的核对工作-Correct wiring of the power measurement device to ensure accurate measurement of the premise, because the energy meter, voltage transformer (PT), current transformer (CT) is a small error and wrong wiring caused the error but can reach infinity (wrong wiring stop Walking phenomenon), described as the first-line of the difference between the amount of ten million, so should be put into operation before or run wiring checks on a regular basis. Wiring checks can be divided into two situations: power outages check, charged checks. Power outage and inspection would be relatively simple, it is generally for the newly installed or replacement of the PT, CT and other metering devices put into operation before the inspection, the main content is to check the PT, the polarity of the CT ratio and secondary wiring check
(系统自动生成,下载前可以参看下载内容)
下载文件列表
JIExianfenxi.doc
本网站为编程资源及源代码搜集、介绍的搜索网站,版权归原作者所有! 粤ICP备11031372号
1999-2046 搜珍网 All Rights Reserved.