文件名称:xiaobofenxi
-
所属分类:
- 标签属性:
- 上传时间:2013-09-11
-
文件大小:101.09kb
-
已下载:0次
-
提 供 者:
-
相关连接:无下载说明:别用迅雷下载,失败请重下,重下不扣分!
介绍说明--下载内容来自于网络,使用问题请自行百度
当本地区达到最大负荷1980+i956MVA时,如果电网能保证按最大运行方式
运行,具备理想的最大供电能力,则容载比为1.2一订.0,电网各供电小区容载比不
均衡,靠各小区之间110KV联络线进行负荷调整也难以达到均衡。-When the maximum load 1980+i956MVA the region, if the grid can guarantee operation at the maximum operating mode, with the ideal maximum power supply capacity, capacity-load ratio of 1.2 a set. 0, the power supply grid cell capacity-load ratio is not balanced, relying on the 110KV tie lines between cells is difficult to achieve a balanced load adjustment.
运行,具备理想的最大供电能力,则容载比为1.2一订.0,电网各供电小区容载比不
均衡,靠各小区之间110KV联络线进行负荷调整也难以达到均衡。-When the maximum load 1980+i956MVA the region, if the grid can guarantee operation at the maximum operating mode, with the ideal maximum power supply capacity, capacity-load ratio of 1.2 a set. 0, the power supply grid cell capacity-load ratio is not balanced, relying on the 110KV tie lines between cells is difficult to achieve a balanced load adjustment.
(系统自动生成,下载前可以参看下载内容)
下载文件列表
xiaobofenxi.doc
本网站为编程资源及源代码搜集、介绍的搜索网站,版权归原作者所有! 粤ICP备11031372号
1999-2046 搜珍网 All Rights Reserved.