文件名称:树状河网计算
-
所属分类:
- 标签属性:
- 上传时间:2017-11-27
-
文件大小:191kb
-
已下载:0次
-
提 供 者:
-
相关连接:无下载说明:别用迅雷下载,失败请重下,重下不扣分!
介绍说明--下载内容来自于网络,使用问题请自行百度
树状河网计算的关键是确定计算河道顺序。计算顺序应遵循的原则是:从支流到干流,从上游到下游。这样可以把河网依次分解为一系列的单一河道,用单一河道的计算方法求解。(The key to the calculation of tree like river network is to determine the order of river courses. The following principles should be followed in the calculation sequence: from the branch to the main stream, from upstream to downstream. In this way, the river network can be decomposed into a series of single river channels and solved by a single channel calculation method.)
相关搜索: 树状河网计算
(系统自动生成,下载前可以参看下载内容)
下载文件列表
文件名 | 大小 | 更新时间 |
---|---|---|
树状河网计算\frm_pic.frm | 10999 | 2016-06-02 |
树状河网计算\FRM_PIC.FRX | 9107 | 2016-06-02 |
树状河网计算\frm_pic.log | 153 | 2016-06-20 |
树状河网计算\Fr_main.frm | 7642 | 2016-06-02 |
树状河网计算\Fr_main.log | 79 | 2016-06-20 |
树状河网计算\hydrology.vbp | 1134 | 2016-06-02 |
树状河网计算\hydrology.vbw | 321 | 2016-06-20 |
树状河网计算\MOD_ABR.BAS | 1574 | 2016-06-02 |
树状河网计算\MOD_BACK.BAS | 187 | 2016-06-02 |
树状河网计算\MOD_BXT.BAS | 500 | 2016-06-02 |
树状河网计算\MOD_BZ.BAS | 608 | 2016-06-02 |
树状河网计算\MOD_CCC.BAS | 1409 | 2016-06-02 |
树状河网计算\MOD_DEF.BAS | 2002 | 2016-06-02 |
树状河网计算\MOD_EXT0.BAS | 345 | 2016-06-02 |
树状河网计算\MSSCCPRJ.SCC | 194 | 2016-06-02 |
树状河网计算\冰山.jpg | 182008 | 2016-06-02 |
树状河网计算\实测.txt | 12070 | 2016-06-02 |
树状河网计算\断面.txt | 4562 | 2016-06-02 |
树状河网计算\糙率.txt | 768 | 2016-06-02 |
树状河网计算 |
本网站为编程资源及源代码搜集、介绍的搜索网站,版权归原作者所有! 粤ICP备11031372号
1999-2046 搜珍网 All Rights Reserved.