搜索资源列表
minimize-makespan
- 生产工程中的调度问题,是实现制造系统运筹技术、管理技术和优化技术发展的核心;有关资料表明,制造过程中95 的时间消耗在非切削过程中;有效的调度方法和优化技术的的研究和应用,已成为先进制造技术(AMT)实践的基础和关键。-Scheduling problem in production engineering, logistics is to achieve the manufacturing systems technology, management and optimization tech
bank2
- Directions Start by changing your working directory to SL275/mod04/exercise2 on your computer. Create the banking directory. Copy the previous Banking project files in this package directory. Modify the Account class to conditionalize the
AMT-development-based-on-matlab
- 东风汽车公司基于matlab的电控机械式自动变速器开发资料,仅供参考- Dong feng auto company, AMT development way based on matlab/simulink and some basic calibration tool such as CANApe
AMT
- AMT modulation in Matlab .d-AMT modulation in Matlab .dll