搜索资源列表
2005_embedded_softerware_report
- 2005年嵌入式软件发展官方详细报告pdf 13页-2005 Embedded Software Development official detailed report pdf 13
PowerPointPresentation
- 物联网全球展望及中国发展的讲座PPT,很多单位研究13-Global outlook of things, and China' s development seminars PPT, many units of study 13
review_of_eu_dp_directive
- Review of the European Data Protection Directive OBJECTIVE: In April 2008, the Information Commissioner’s Office (ICO) commissioned a review of the 1995 EU Data Protection Directive (95/46/EC, hereafter “the Directive”). In the 13 years since
PBOC2.0-13
- 中国人民银行2010颁布的金融IC标准,PBOC2.0,很难搞到的哦!-2010 People' s Bank of China promulgated standards of financial IC, PBOC2.0, hard to come by, oh!
shanote
- Collision Search Attacks on SHA1 Xiaoyun Wang∗ Yiqun Lisa Yin† Hongbo Yu‡ February 13, 2005-Collision Search Attacks on SHA1 Xiaoyun Wang∗ Yiqun Lisa Yin† Hongbo Yu‡ February 13, 2005
13-Anonymizing-Social-Networks
- 对社会网络进行谱不变的随机扰动方法,保护社会网络中个体用户的隐私-randomizing social network:a spectrum preserving approach
science4
- The current European Union (EU) energy policy seeks to reach a balance between sustainable development, competitiveness and secure supply. In this sense, the EU energy policy sets the target of a 13 share of renewable energy sources (RESs) for B
ajp-jp3v7p2433
- The current European Union (EU) energy policy seeks to reach a balance between sustainable development, competitiveness and secure supply. In this sense, the EU energy policy sets the target of a 13 share of renewable energy sources (RESs) for B
A11
- 2005年8月13日起,欧盟市场上流通的电子电气设备的生产商必须在法律上承担起支付报废产品回收费用的责任,同时欧盟各成员国有义务制定自己的电子电气产品回收计划,建立相关配套回收设施,使电子电气产品的最终用户能够方便并且免费地处理报废设备。-August 13, 2005, the circulation in the EU market electrical and electronic equipment manufacturers must assume the legal responsi
13.RECENT-DEVELOPMENTS-ON-EMD
- EMD 的经典文献,描述了EMD最近的一个进展-EMD classic literature, describes the EMD a recent progress
Random_Testing_of_C_Calling_Conventions
- In a C compiler, function calls are difficult to implement correctly because they must respect a platform-specific calling convention. But they are governed by a simple invariant: parameters passed to a function must be received unaltered. A
Occam1DCSEM_V3.13
- csamt ocaam 1D inversion
JGSPKDOPMKN-S-13-00019
- Earthquake forecast mechanism for wireless sensor using precursor study
sensors-13-01160
- this a research document describing how to design and implement a vds evaluation system-this is a research document describing how to design and implement a vds evaluation system
principal-component-analysis
- The key concept in principal component analysis (PCA) is to reduce a high dimensional data volume into a lower dimensional space, where the low dimensional data con-tams most of the useful information/variance contained in the original data set. The
Untitled
- The eight voltage vectors U0 - U7 correspond to the possible states of the inverter (Fig. 2.13). Each of these states can be composed by a different equivalent electrical circuit. In Fig 2.19 the circuit for the vector U1 is presented.
p8
- Path synthesis of the four-bar mechanism using ABC algorithm and comparing with BGA-978-1-4799-0661-1/13/$31.00 © 2013 I-Path synthesis of the four-bar mechanism using ABC algorithm and comparing with BGA-978-1-4799-0661-1/13/$31.00 © 201
1mimo_channel_capacity_simulation
- these peak-reducing signals are built by using spreading codes that are either dynamically selected those users that are known to be idle, or deliberately reserved a priorifor PAPR reduction purposes. The concept of adding orthogonal signals for peak
13
- ISO (the International organization for stadardiization) and IEC (the International Electrotechnical commission) form the specialized system for worldwide standardization. The first standard of this deals with the threat and countermeasure of biometr
sensors-13-03831
- pmsm space vector pwm control