搜索资源列表
TEL02_2
- This communication presents an alysis of the design and fabrication of power-efficient, low cost VCSEL-based optical transceiver proposed for emerging fiber data distributed interface (FDDI) and fiber channel local-area network (FCLAN
LinkBudgetCalculation_m
- link budget design for satellite communication. it calculates parameters such as EIRP, Gain, etc
W-Handover_and_Call_Drop_Problem_Optimization_Gui
- wimax link budget calaculation for wimax network
A-Sirius_Satellite_Radio
- An article on Sirius satellite radio,link budget,antennas.Multiple figures and shapes all in greek language
Satellite-Comms-Link-Budget
- Satellite link budget slides
Optical_fibre_assignment
- Optical fiber transmission link with power link budget and other limitations
Configuration-and-the-Calculation-of-Link-Budget.
- Configuration and the Calculation of Link Budget
NSMG-NET-Theme-1-Overview-AGM-Vancouver-July-2013
- three projects have spent the allocated budget according to the original budget plan - one project has under-spent the allocated budget -three projects have spent the allocated budget according to the original budget plan
exp
- MATLAB codes for BPSK, QPSK, Differential BPSK, Pulse shaping and link budget calculation are uploaded
fwdlabprograms
- In this optic fiber link budget analysis and pcm and other program are written in matlab code
Mob-Com-Presn
- This document illustrates the digital modulation techniques and filtering techniques i.e., raised cosine and Gaussian filters and also the microwave link budget design
3zuoye
- 某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的